Fulfilled needs
Hard core
€441 of €441 funded
Ordinary Portland Cement (OPC)
€1103 of €1103 funded
Salaries – Part 1
€735 of €735 funded
Security margin
€3986 of €3986 funded
B.R.C (G.142)
€471 of €471 funded
Sown soft wood for form work
€103 of €103 funded
Water – Part 1
€50 of €50 funded
Removing of excavated materials
€412 of €412 funded
River sand
€221 of €221 funded
Rolls of polythene membrane
€412 of €412 funded
Lake sand
€294 of €294 funded
Supply kaliptus and boards for setting out
€44 of €44 funded
Well-burnt clay bricks – Part 1
€794 of €794 funded
Aggregates 1 ½ “
€471 of €471 funded
Excavation and foundation
€500 of €500 funded
Aggregates ¼″
€118 of €118 funded
Supply sand lake and river
€588 of €588 funded
Salaries – Part 2
€1471 of €1471 funded
Binding wire
€24 of €24 funded
Steel bars for reinforcement
€1059 of €1059 funded
Dump prof membrane D.P.C
€44 of €44 funded
Well-burnt clay bricks – Part 2
€1015 of €1015 funded
O.P.C (Cement)
€1029 of €1029 funded
Steel bars and rings for reinforcement
€79 of €79 funded
Kaliptus
€37 of €37 funded
Ring beam boards
€265 of €265 funded
Water – Part 2
€118 of €118 funded
4-inch nails
€74 of €74 funded
Tie bars
€235 of €235 funded
Hoop iron
€147 of €147 funded
Ceiling boards for the whole area
€3676 of €3676 funded
Transporting materials – Part 1
€59 of €59 funded
Salaries – Part 3
€882 of €882 funded
1-½-inch nails
€26 of €26 funded
3-inch nails
€59 of €59 funded
5-inch nails
€29 of €29 funded
6-inch nails
€29 of €29 funded
Wall plate
€147 of €147 funded
Struts and ties
€4765 of €4765 funded
Purlins
A horizontal structural member bridging two or more rafters of a roof. (Wiktionary)
€371 of €371 funded
Fascia boards
€199 of €199 funded
Wood preservative
€88 of €88 funded
Roofing felt
€4412 of €4412 funded
Roof ridges
€176 of €176 funded
Roofing nails
€97 of €97 funded
Transportation costs – Part 2
€59 of €59 funded
Salaries – Part 4
€235 of €235 funded
Door glasses
€18 of €18 funded
Timber Doors
€600 of €600 funded
Windows
€75 of €75 funded
Steel casement windows
€750 of €750 funded
Steel Doors
€235 of €235 funded
Shower basin
€147 of €147 funded
Toilet set
€250 of €250 funded
Wash basin set
€206 of €206 funded
Shower trays and accessories
€191 of €191 funded
Sanitary fittings and drainage system
€765 of €765 funded
Kitchen plumbing
€441 of €441 funded
Towel rails
€88 of €88 funded
Mirrors
€147 of €147 funded
Salaries – Part 5
€353 of €353 funded
Plaster for the walls
€221 of €221 funded
Sand – Part 2
€1471 of €1471 funded
Salaries – Part 6
€353 of €353 funded
Cement (OPC)
€1471 of €1471 funded
White lime
€147 of €147 funded
Tiles
€706 of €706 funded
Cement (OPC) for plaster and floor screed
€735 of €735 funded
7029 mm
€368 of €368 funded
MK Boxes (i)single
€44 of €44 funded
Main switch
€588 of €588 funded
¾-inch conduits
€71 of €71 funded
1-inch conduits
€44 of €44 funded
Salaries – Part 7
€588 of €588 funded
Double pole socket
€39 of €39 funded
3 gang 3 way switch
€47 of €47 funded
16 mm
€471 of €471 funded
Double
€35 of €35 funded
Lamp
€79 of €79 funded
Single pole socket outlet
€21 of €21 funded
1 gang 1 way switch
€12 of €12 funded
2 gang 2 way switch
€37 of €37 funded
Cooker control units
€97 of €97 funded
3029 mm
€212 of €212 funded
Earth rod
€71 of €71 funded